After waiting until 11am for the inspection (which went fine), we got started.
Dad mixed while Alan finished the gas pipe.

Then Alan and Dad mixed - pam watched and fetched water as needed.

After lunch, Dad started laying the firebox floor.

The end of the day - a hearth floor (to the left) and a firebox floor.

Hi Mom!!!
